| Sign In | Join Free | My polstate.com |
|
| Categories | Microbrewery Brewing Equipment |
|---|---|
| Brand Name: | SLET |
| Model Number: | SL-200L |
| Certification: | CE ISO |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | USD 19800- 50,000 Per set |
| Payment Terms: | T/T |
| Supply Ability: | 20 sets per month |
| Delivery Time: | 30 working days after the deposit |
| Packaging Details: | PE paper & iron frame |
| Material: | SS304 / 316 |
| Heating: | gas / electricity / steam |
| Control: | automatic / Semi-automatic |
| Exhausting: | Indoor or outside |
| Brewhouse: | kettle, lauter, Mash, whirlpool in one unit or 4 seperate |
| Fermenters: | 100l conical cylinder tank or 200l fermenter |
All stainless steel 304 and electric heating 200L Brewhouse
200kg/h, double rollers malt mill
200LMash/lauter, kettle/whirlpool+plate heat exchanger
200L Fermentation tanks + brite beer tanks
500L Glycol tank+chiller
50L CIP, alkali+acid+electric heating
Control cabinet, manual, automatic control seperately
Keg system
| Brew House | Beer Tank | Support Equipments | SS Keg | Kegging line |
100L to 5000L | 100L to 20000L | / | DIN 20L,30L, US 1/6, 1/4,1/2bbl. Euro 20L,30L,50L. | 60-80kegs per hour |
Single Two vessels, Combined Two vessels Three vessel, Four vessels or Customized | Concial / Horizontal | Malt mill, hot liquor and glycol tanks, plate heat exchanger,steam generator, CIP system, PLC contro system. | / | Single station, Doubel station Conbained system |
1. Brewhouse: two vessels, three vessels, four vessels brewhouse
2. Heating medium: steam heating
3. Insulation material: rock wool. Insulation thickness: 100mm
4. Mash tank; hydrator, mixer, steam heating jacket
5. Lauter tun: rake, agitator, false bottom, hydrator
6. Brewkettle, steam heating jacket, inner steam heating deivce
7. Whirlpool tun: whirlpool entry

Technological specification
| Outside surface | Stainless steel or red copper,THK:2mm |
| Inner surface | S.S.304,THK:3mm |
| Top shape | Seal head or conical head |
| Heating method | electricity/Steam |
| Insulation layer | Protected by polyurethane,THK:70-100mm |
| Polishing | ≤0.4µm |
| Manhole | Side upward or your requirements |
| Plate heat exchanger | 4m² |
| Agitator | Raking system conneted into a top reducer |

The output of Beer making machinery pls as a reference
| Daily output | 100L | 200L | 300L | 500L | 600L | 800L | 1000L | 2000L | 3000L | 5000L |
| unit type | SL100 | SL200 | SL300 | SL500 | SL600 | SL800 | SL1000 | SL2000 | SL3000 | SL5000 |
| floor space | 15m² | 20m² | 25m² | 45m² | 55 m² | 70m² | 80m² | 120m² | 150m² | 250m² |
| power | 8KW | 12KW | 20KW | 35KW | 35/15KW | 35/15KW | 35/15KW | 65/15KW | 65/15KW | 65/15KW |
Beer production period | 10-12/ days | 10-12/ days | 10-12/ days | 10-12/ days | 10-12 /days | 10-12 /days | 10-12 /days | 10-12 /days | 10-12 /days | 10-12 /days |

TERMS
Trade term: FOB Qingdao
Packing: Iron frame+wood box, suitable for long shipping transportation
Payment, 50% in advance as depsoit, the balance before the delivery
Delivery, 30 working days after the deposit arrival
Warranty: 5 years for main body, 6 months for electrical componets andparts

|